Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Jul 13, 2022     45-2 Cabin Doors and Transparency Step 2-4 - (2 hours) Category: Fuselage
trimmed perimeters of doors and cabin opening. drilled the reference holes in the doors halves. The bottom reference holes were pretty spot on, the marking for the top holes were pretty off....therefore i clamped the two halves and drilled again the top reference lines. Sanded the inner halves in preparation of the mating.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.